• Home
  • Logistics
  • Redefine Efficiency: Case Study of an Express Delivery Company in the UK.

Redefine Efficiency: Case Study of an Express Delivery Company in the UK.

Redefine Efficiency: Case Study of an Express Delivery Company in the UK.

𝐂𝐚𝐬𝐞 𝐨𝐟 𝐭𝐡𝐞 𝐖𝐞𝐞k

This week, we take you to the northern UK, where a logistics hub faced increasing parcel volumes and the inefficiencies of manual sorting—high costs, low speed, and frequent mis-sorting.

𝐂𝐮𝐬𝐭𝐨𝐦𝐞𝐫 𝐂𝐡𝐚𝐥𝐥𝐞𝐧𝐠𝐞

Diverse Parcel Sizes & Weights -The system needed high flexibility to process various parcels simultaneously.
Manual Sorting Bottlenecks – Inefficiency and high mis-sorting rates limited growth, while labor costs impacted profitability.
Limited Chute Flexibility – Existing configurations couldn’t fully support diverse consolidation needs.

𝐖𝐚𝐲𝐳𝐢𝐦’𝐬 𝐒𝐨𝐥𝐮𝐭𝐢𝐨𝐧

Wayzim engineered a highly flexible Narrow Belt Sorting System, ensuring seamless handling of different parcel types while reducing costs and boosting operational efficiency.

𝐏𝐫𝐨𝐣𝐞𝐜𝐭 𝐃𝐚𝐭𝐚

Daily Capacity: up to 80,000 parcels
Peak Speed: 5,000 pph
Optimized Footprint: 1,800㎡

𝐊𝐞𝐲 𝐄𝐪𝐮𝐢𝐩𝐦𝐞𝐧𝐭

5-sided Scan Tunnel
Dynamic Weighing System
Dimension Camera
Belt Conveyors
290 Narrow Belt Sorter Carriers
23 Sorting Discharge Points

Wayzim Technology Co., Ltd.’s customized approach enhanced sorting efficiency, reduced mis-sorting, and optimized labor costs, helping the client scale operations and stay competitive.

Share on Facebook Share on Twitter